ADNOC Gas - ESTIDAMA: Habshan 7 New Gas Processing Train

General Information
Owner ADNOC Gas
Masterplan Project (Parent Profile) ADNOC – Upgrade of Sales Gas Pipeline Network (ESTIDAMA) – Emirate of Abu Dhabi
Location Abu Dhabi, Emirate of Abu Dhabi, UAE
Status --
Sector Gas, Downstream, Gas Processing Plant
Contract Type Engineering Procurement Construction (EPC)
Onshore/Offshore Onshore
Greenfield/Brownfield Greenfield
Progress 0
Estimated Budget Value ---
Contract Value 0
Net Value $1100m
Award Date December 2025
Completion Date October 2029
Last Updated On August 2025
ProjectId (Old, New) 509474, 509474


ADNOC Gas Processing is planning to undertake the construction of a Habshan 7 new gas processing train project in Abu Dhabi, the UAE.

The gas processing plant having a capacity of 670 MMSCFD.

The project is a part of the Habshan gas processing complex

The US$1100 million project involves the following:

1. Construction of a new high-pressure pipeline

2. Construction of the separation and condensate stabiliser unit

3. Installation of acid gas removal unit

4. Installation of mercury removal unit

5. Construction of a deep NGL recovery unit

6. Installation of sales gas and residue gas compressor

7. Construction of NGL product storage and transfer pump

8. Installation of utility units

a. Installation of Instrument Air (IA) System

b. Installation of Nitrogen (N2) System

c. Installation of Potable Water (PW) System

d. Installation of Fire Water (FW) System

e. Installation of Steam Generation System

f. Installation of Demineralized (DM) Water System

9. Construction of the flare unit

10. Installation of flare gas recovery package

11. Construction of water treatment package

12. Construction of non-process buildings

13. Installation of power generation system

14. Construction of NGL pipeline

15. Construction of sales gas pipeline

Second Section

26 August 2025

The main contractor tender has been issued and the following companies biding are Petrofac, Tecnimont, Samsung, Sinopec, L&T, CPECC, Petrojet /ENPPI in a consortium.

12 August 2025

The main contractor tender has been issued with the submission in mid September of 2025. (Source: MEED)

17 June 2025

The expression of interest (EoI) was issued in March, and the contractors have submitted their interests on April 8, 2025, Wood Group has performed the study & initial engineering design on the project. (Source: MEED)