ADNOC - ESTIDAMA: LPP - LNG Preconditioning Project
ADNOC Gas Processing is undertaking the upgrade of its sales gas pipeline network upgrade of the LNG Preconditioning Plant (LPP) in the UAE.
The objective of the LPP facility is to further process the residue gas of MERAM facilities to produce minimum 1500 MMSCFD of preconditioned gas suitable to produce LNG.
The feedstock for the new LNG plant in Ruwais will be supplied by Adnoc Gas from its new MERAM+LPP integrated facility in Habshan 5.
The MERAM+LPP integrated facility shall process residue gas to meet the LNG feed gas specification (quantity and quality except high heating value (HHV).
This project is known as ESTIDAMA.
The US$1300 million project includes the following:
1. Installation of HP absorber & regenerator columns and internals
2. Installation of internals for HP absorber and regenerator
3. Installation of molecular sieve adsorber
4. Installation of air cooled exchangers
5. Installation of centrifugal compressor
6. Installation of centrifugal centrifugal pumps (API Horizontal)
7. Installation of cooling water refrigeration
8. Installation of instrument air compressor
9. Installation of gas turbine generator
10. Installation of steam turbine generator
11. Installation of WHRB
12. Installation of power transformers 132/33kV
13. Installation of ICSS
14. Installation of ESD/on-off valves
15. Installation of sales gas metering skids
16. Installation of analyzers
17. Installation of tie-ins with MERAM and existing Habshan 5 facilities
18. Construction of associated works (including grading works, road works, fencing)
Second Section
No Content
No Content
09 January 2025
The consortium of Petrojet and Enppi has been awarded as the main contractor for a project with an value of US$1300 million.
18 November 2024
The main contract commercial bid submission is on November 20, 2024. The following companies are likely to bid for this project Petrojet, Enppi, NMDC Energy & Tecnicas Reunidas.