ADNOC Onshore - Bab Compression Facilities Expansion: Phase III
ADNOC Onshore was planning to expand phase III of the Bab Compression Facilities project in Abu Dhabi, the UAE.
The project aims to operate two compressors in parallel and the third in series when reservoir gas continues to decline. The project will carry out modifications required in the existing compressor stations CS1, 2, 3 & 4.
The US$55 million project included the following:
1. Construction of compressor stations 1,2,3 and 4
a.) CS 1, 2, and 3 have four incoming trunk lines carrying HC gas
b.) CS 4 is supplied by three incoming trunk lines
2. Construction of three high-pressure gas discharger
3. Construction of separated condensate is remixed with outgoing gas in a controlled manner
4. Construction of the main gas control room
5. Construction of four operator workstations
6 Modification of existing 33kV GIS main intake substation near existing 220kV TRANSCO substation
7. Modifications of 33kV GIS switchgear
8. Modifications in earthing works
9. Modifications in electrical cable routing works
10. Installation of suction header
11. Installation of three compressor trains to boost pressure to 90 barg by centrifugal compressors
12. Installation of trunk lines are reconnected to existing trunk lines network going to Gasco plant
13. Installation of main intake substation (MIS)
14. Installation of two power transformers
15. Installation of the load dispatch centre
16. Laying of double circuit overhead lines
17. Installation of LV switchgear
18. Installation of distribution transformers
19. Installation of harmonic filters
20. Installation of transformer
21. Installation of the bus bar
22. Installation of 220kV cable differential
23. Laying of 33kV overhead line
24. Installation of tariff meter panels
25. Installation of the SCMS system
26. Installation of the FMS system
27. Installation of HVAC Power and control panels
28. Installation of step-down transformer 415V
29. Installation of NER and AC/DC UPS system
30. Installation of four hardwired consoles for ESD
31. Installation of hardwired consoles for F&G
32. Installation of historian server
33. Installation of an integrated control system
Second Section
No Content
No Content
07 August 2024
The construction works have been completed on the project.
01 February 2024
Archirodon is working as the MEI subcontractor and the construction works are ongoing on the project and are expected to be completed by 2025.
29 September 2023
Construction works have not yet commenced on the project.
10 August 2023
Construction works are expected to commence in September 2023.
08 May 2023
Detailed Engineering works are ongoing and construction works are yet to commence on the project.
05 January 2023
The Detailed Engineering works are ongoing on the project and the construction works are expected to be commenced within 2-3 months.
19 July 2022
China Petroleum Pipeline Engineering (CPPE) has been awarded the detailed engineering sub-contract work on the project. (Source: MEED)
15 July 2022
The engineering, procurement and construction (EPC) works contract has been awarded to Archirodon at a value of US$55 million. (Source: MEED)
06 July 2022
The main contract bids are still under evaluation.
18 April 2022
The commercial bid submission has taken place and is currently under evaluation.
30 March 2022
The commercial bid submission deadline has been extended from March 31, 2022, to April 14, 2022. (Source: MEED)
15 March 2022
The commercial bids submission deadline has been extended and is expected by the end of March 2022.
02 February 2022
The commercial bids submission is expected by the end of February 2022.
28 January 2022
The following companies had submitted the technical bids on January 27, 2022: Al Asab Contracting Establishment, Adyard, Archirodon, China Petroleum Engineering & Construction Corporation, Galfar Contracting, Robt Stone LLC, Emarat Aloula, Kalpataru, Matrix Construction, NBTC Group, Petrojet, Target Engineering Construction Co, Tata Projects, and Fortune Engineering and Energy Services.
23 January 2022
The commercial bid submission date is yet to be decided. The following companies are understood to be bidding for the project: Adyard Abu Dhabi, Al-Asab General Trading & Contracting , Archirodon, China Petroleum Engineering & Construction Corporation, Emarat Aloula, Fortune Engineering & Energy Services, Galfar Engineering & Construction, Kalpataru, Matrix Construction, NBTC Group, Petrojet, Robt Stone, Target Engineering Construction Company, and Tata Projects. (Source: MEED)
04 January 2022
The main contract tender has been re-issued with a technical bid submission deadline on January 27, 2022.
07 October 2021
The tender is yet to be re-issued.
23 August 2021
The tender is yet to be re-issued.
01 June 2021
The research team was able to confirm that the main contract tender has been cancelled and is expected to be re-tendered in the third quarter of 2021.
17 May 2021
The technical bids are under evaluation and the commercial bid submission date is yet to be announced.
10 February 2021
The client has re-tendered the project and the revised technical bid submission took place on February 8, 2021. Robt Stone, Adyard, Al Asab, Archirodon, Arkad ABB, Bilfinger Tebodin, CPECC, Galfar Contracting, Intecsa Industrial, Emarat Aloula, Petrojet, JV of CCC & Sicon Oil & Gas, Tata Projects, Target Engineering, SNC Lavalin have submitted bids.
07 January 2021
Main contract is yet to be awarded and the time frame for the same is unknown at this moment.
29 October 2020
The project is not yet awarded and the time frame for same is unknown at this juncture.
27 August 2020
The project is yet to be awarded and the time frame for same is unknown at this juncture.
16 July 2020
LOI is yet to be issued and the time frame for main contract award is unknown at this juncture.
11 June 2020
The project is yet to be awarded and Archirodon have matched the target price (US$103 million) set by ADNOC Onshore. Letter of Intent (LOI) is expected to be issued within a week. (Source: MEED)
21 May 2020
The bid evaluation is underway and Archirodon has been emerged as the lowest bidder.
30 April 2020
The commercial bid submission has been done in April, 2020 and Archirodon, RobtStone, Al Asab, CPECC, Galfar, Target Engineering, Petrojet have submitted the bids.
31 March 2020
The commercial bid submission is yet to be done.
10 December 2019
The technical bid submission has taken place and Rob Stone LLC, Target Engineering, Galfar, Al Asab, Petrojet have submitted the bids.
06 December 2019
The technical bid submission date has been extended to December 8, 2019.
30 October 2019
The project has been revived and re tendered with the technical bid submission due on November 17, 2019.
24 October 2018
The project continues to be on hold.
18 June 2018
The project has been put on hold.
10 May 2018
The commercial bid submission has not yet been announced for the project.
09 April 2018
The commercial bid submission has not yet been done for the project.
25 February 2018
The commercial bid submission has not yet been done for the project.
09 January 2018
It is understood that Tata Projects has also submitted the technical bid for the project. The client has not yet announced the date for commercial bid submission.
05 December 2017
The client has not yet announced the commercial bid submission date on the project.
05 November 2017
The client has not yet announced the commercial bid submission date on the project.
20 October 2017
On 15 October 2017, Abu Dhabi Company for Onshore Petroleum Operations has been changed and now will trade as ADNOC Onshore.
09 October 2017
The client has not yet announced the commercial bid submission date on the project.
17 September 2017
The client has not yet announced the commercial bid submission date on the project.
21 August 2017
The client has not yet announced the commercial bid submission date on the project.
18 July 2017
The client has not yet announced the commercial bid submission date.
19 June 2017
The client has not yet announced the commercial bid submission date.
31 May 2017
Toledo & NBTC amongst others have submitted the technical bids on the project.
22 May 2017
The technical bid submission was on April 25, 2017. The following companies amongst other companies have submitted the technical bids on the project : *Al Asab Est *Matrix Construction *RobtStone The date for the commercial bid submission is not yet announced on the project.
21 May 2017
TATA Projects Limited have submitted its EOI for this project.
07 April 2017
The following companies among others have been invited to submit PQ document on the project: * Petrofac * Consolidated Contractors * SK E&C * GS E&C * Tecnicas Reunidas * Tecnimont * Dodsal
05 April 2017
The EOI has been issued and PQ document submission is yet to be done on the project. The following companies among others have been invited to submit PQ document on the project: * Petrofac * Consolidated Contractors * SK E&C